Shahuindo
Client: Minera Shahuindo S.A.C.
Cajamarca, Perú
1. Project Overview
The Shahuindo Project is an open-pit gold operation located at approximately 2,900 m.a.s.l., utilizing heap leaching as its primary metallurgical process.
2. Project Challenges
-
Development of multiple heap leach phases (Pad 1, Pad 2A, Pad 2B).
-
Stability of pit slopes and containment systems.
-
Infiltration modeling and solution level prediction.
-
Geomembrane integrity verification in PLS ponds.
-
Surface and subsurface drainage system design.
-
Adaptation to Environmental Impact Assessment Modification (MEIA) requirements.
3. Our Approach and Solutions
-
Sequential basic and detail engineering of leach pad expansions.
-
Geotechnical evaluation of slopes, platforms, and structures.
-
Infiltration simulation modeling for pad performance optimization.
-
Dry-lance geoelectrical methods for liner verification.
-
Design of sedimentation ponds, sub-drains, conveyance systems, and pumping infrastructure.
-
Implementation of CQA/CQC programs for earthworks and geosynthetics.
-
Conceptual design of sub-vertical drains to enhance drainage performance.
4. Results Achieved
-
Phased pad development optimizing metallurgical performance.
-
Verified stability of slopes and containment structures.
-
Environmental protection through continuous liner verification.
-
Efficient water management systems.
-
Infrastructure development supporting crushing and agglomeration improvements.