Engineering

Huarón

Client: Compañía Minera Huaron S.A.

Pasco, Perú

1. Project Overview

The Huarón mine is located at 4,534 m.a.s.l. and operates using cut-and-fill and long-hole mining methods.


2. Project Challenges

  • High-altitude operations.

  • TSF raises and closure processes.

  • Stormwater management in high-precipitation conditions.

  • Seepage control and physical stability assurance.


3. Our Approach and Solutions

  • Feasibility studies for TSF closure using waste rock.

  • Reinforced soil wall design for dam raises.

  • Advanced geotechnical instrumentation.

  • Grouting reinforcement techniques.

  • Seepage and stability modeling.

  • Dam break studies and hydraulic structure design.

  • Implementation of stability buttresses.


4. Results Achieved

  • Detailed engineering for closure of TSFs 1–3.

  • Successful raise of TSF No. 5 using reinforced wall systems.

  • Optimized stormwater management.

  • Continuous CQA during raise stages.

  • Updated operational manuals and monitoring systems.