Construction Services

Shahuindo

Client: Minera Shahuindo S.A.C.

Cajamarca, Perú

1. Project Overview

The Shahuindo Project is an open-pit gold operation located at approximately 2,900 m.a.s.l., utilizing heap leaching as its primary metallurgical process.

2. Project Challenges

  • Development of multiple heap leach phases (Pad 1, Pad 2A, Pad 2B).

  • Stability of pit slopes and containment systems.

  • Infiltration modeling and solution level prediction.

  • Geomembrane integrity verification in PLS ponds.

  • Surface and subsurface drainage system design.

  • Adaptation to Environmental Impact Assessment Modification (MEIA) requirements.

3. Our Approach and Solutions

  • Sequential basic and detail engineering of leach pad expansions.

  • Geotechnical evaluation of slopes, platforms, and structures.

  • Infiltration simulation modeling for pad performance optimization.

  • Dry-lance geoelectrical methods for liner verification.

  • Design of sedimentation ponds, sub-drains, conveyance systems, and pumping infrastructure.

  • Implementation of CQA/CQC programs for earthworks and geosynthetics.

  • Conceptual design of sub-vertical drains to enhance drainage performance.

4. Results Achieved

  • Phased pad development optimizing metallurgical performance.

  • Verified stability of slopes and containment structures.

  • Environmental protection through continuous liner verification.

  • Efficient water management systems.

  • Infrastructure development supporting crushing and agglomeration improvements.